What goes into a full renovation
It means changing the home almost completely: layout, installations and finishes. In Estepona we mainly do it for flats in the old town and centre that haven't been touched in decades, and for coastal apartments and villas bought to be updated and let.
- Demolition and rubble removal
- New layout and partition walls
- New plumbing and electrics
- Complete kitchen and bathrooms
- Floors, tiling and false ceilings
- Doors, wardrobes and windows
- Painting and finishing
- Final post-construction clean


How the work is organised
We start with a visit: we measure, check the real condition of the installations and listen to what you want to change. With that we prepare an itemised quote, so you can see what each job costs and decide where to adjust.
Then we set the order: installations, partition walls, floors and finishes. That sequence is what avoids breaking into finished work later, and what makes a project finish on time.
Permits in Estepona
Depending on what's involved, Estepona Town Hall requires either a declaración responsable (works notification) or a building licence. We tell you which one your case needs before you start.
Full home renovations in Estepona and nearby
We cover the whole municipality of Estepona and its coastline. These are the areas where we carry out full renovations:
- Full home renovations in Estepona town centre
- Full home renovations in Cancelada
- Full home renovations in El Paraíso
- Full home renovations in Sabinillas and Manilva
- Full home renovations in Casares
Frequently asked questions
How long does a full renovation take in Estepona?
It depends on the size and finishes. An average flat usually takes several weeks of work. We give you an approximate schedule together with the quote.
Can I live at home during the work?
For a full renovation we don't recommend it: water and electricity are cut off in stages and there's a lot of dust. For renovations done area by area, it can be organised.
Do you work on holiday rental apartments?
Yes. It's common in the area. We plan the work outside peak season so the apartment loses as few weeks as possible.